Metallic Structure
Oja Ultrafrozen
The project consisted of two phases: the first was a cold storage machine building, and the second was a storage facility consisting of 53-meter-span tubular trusses with a height of 18 meters. Assembly was carried out using modules composed of two trusses and all the connections between them, followed by coordinated lifting by two cranes. Another handicap was the tight deadlines for both manufacturing and assembly.
Location: SANTO DOMINGO DE LA CALZADA
Structure Industrial. Food sector.
Surface: 4860 m2
Tonnage: 320 Kgs.
Activity: Leading food group in the deep-frozen vegetables sector.



















